CBL - Campus del Baix Llobregat

Projecte llegit

Títol: Plan de ampliación de la plataforma de estacionamiento de aeronaves del aeropuerto de Lleida-Alguaire.


Estudiants que han llegit aquest projecte:


Director/a: HUERTA CARRILLO, MARIA

Departament: FIS

Títol: Plan de ampliación de la plataforma de estacionamiento de aeronaves del aeropuerto de Lleida-Alguaire.

Data inici oferta: 03-02-2012     Data finalització oferta: 03-10-2012



Estudis d'assignació del projecte:
    Tipus: Individual
     
    Lloc de realització: EETAC
     
    Paraules clau:
    Aeropuerto, Lleida, Plataforma
     
    Descripció del contingut i pla d'activitats:
    Proyecto de ampliación de la plataforma de estacionamiento de aeronaves del Aeropuerto de Lleida-Alguaire.

    Incluye:
    - Justificación de la ampliación.
    - Actividades necesarias para la ampliación.
    - Cálculo de infraestructuras necesarias.
    - Valoración económica.
     
    Overview (resum en anglès):
    The Lleida-Alguaire airport was inaugurated in 2010 with installations designed for short-range operations. The infrastructures were thought to provide a service to mainly regional flights, with medium-small aircrafts.
    However, during the last year the airport has experimented, due to the winter season of skiing, an increment of the aerial traffic of aircrafts some of them with a bigger wingspan that it was previously considered. These flights have been operated for charter companies from the Great Britain that have offered vacation skiing packs in the Lerida's Pyrenees and Andorra, having as a connection airport the Lleida-Alguaire airport.
    Taking into account the great success of these flights offer because of the high occupation of the passengers, it has been anticipated an increment of this kind of operations in the next years.
    Due to this future forecast it has been believed necessary the execution of an extension plan of the current aircraft parking platform with the purpose of giving a service to the future demand of a bigger number of aircrafts brought about charter companies.
    To execute the design of the extension it has been needed some previous studies, that are about, among other aspects: the thicknesses pavement of the platform, the type of drainage, the horizontal signposting, the lighting supply, the services affected and the integration environmental, as well as the work plan and the operational capacity of the airport during the work.
    Finally, once the platform has been designed taking into account all the points needed for such effect, it has been executed the final budget of the building work, which includes the total expense necessary to conduct the building work suggested.


    © CBLTIC Campus del Baix Llobregat - UPC