Campus del Baix Llobregat
 
Projectes oferts

Projectes matriculats

Tribunals i dates de lectura

Projectes llegits
(2012-2)

DG ENG AERO/SIS TEL

DG ENG AERO/TELEMÀT

DG ENG SISTE/TELEMÀT

ENG TELEC 2NCICLE 01

ET AERO/ETT SIST 05

ET AERONÀUTICA 03

ETT SIST/ ET AERO 05

ETT SIST TELEC 00

ETT SIST TELEC 91

ETT TELEMÀTICA 00

GR ENG AERONAVEGACIÓ

GR ENG AEROPORTS

GR ENG SIS TELECOMUN

GR ENG SIST AEROESP

GR ENG TELEMÀTICA

MU AEROSPACE S&T 09

MU DRONS

MU MASTEAM 2009

MU MASTEAM 2015

Cerca projectes

Calendari TFG de dipòsit i lectura

Documentació

Web UPC


 

Projecte llegit

Títol: Optimization of the Resin Transfer Moulding Machine to produce composite materials for Airbus

Director: CASAS PIEDRAFITA, Oscar

Departament: EEL

Títol: Optimization of the Resin Transfer Moulding Machine to produce composite materials for Airbus

Data inici oferta: 19-02-2013     Data finalització oferta: 19-10-2013


Estudis d'assignació del projecte:
    MU AEROSPACE S&T
Tipus: Individual
 
Lloc de realització: Fora UPC    
 
        Supervisor extern: Juan Carlos Rubalcaba
        Institució/Empresa: IMDEA Materiales
        Titulació del Director: Doctor
 
Paraules clau:
Avionics materials, Instrumentation systems
 
Descripció del contingut i pla d'activitats:
Resin Transfer Molding is a technique used to make composite materials. Reinforcement material is placed in half of the mold and the second half of the mold clamped over the top. The reinforcement material can be pre-pressed into the mold shape; this is known as "preform". Resin materials are machine-mixed prior to being injected under pressure into the mold cavity. Complete wetting of the reinforcement material is achieved by either a pinch off device or application of vacuum to draw the resin through the cavity. Once the mold cavity is filled, the resin inlet is closed and the laminate allowed to cure.
The current problem starts when it comes to making a fully homogeneous semi cured throughout the composite; this is because the machine operates under a limited design and control. One of the things to be improved is the monitoring of the gradient of the temperature, and this can be done by making a few changes in the position of each thermocouple. Another thing to consider is to make a complete change in the control of the machine, that is, changing the hardware and software.
The changes in the machine will require different experiments in order to study the performance of the system, thus, observation will be a key parameter during the development of the project, considering that controlling the temperature takes a lot of time in order to establish a pattern.
Finally, the main idea will be to compare the performance of the current system with the new one, taking into account the final product, the time of the process, the money investment, among other things.
 
Overview (resum en anglès):

Resin Transfer Molding is a technique used to make composite materials. Reinforcement material is placed in half of the mold and the second half of the mold clamped over the top. The reinforcement material can be pre-pressed into the mold shape; this is known as "preform". Resin materials are machine-mixed prior to being injected under pressure into the mold cavity. Complete wetting of the reinforcement material is achieved by either a pinch off device or application of vacuum to draw the resin through the cavity. Once the mold cavity is filled, the resin inlet is closed and the laminate allowed to cure.
The current problem starts when it comes to making a fully homogeneous semi cured throughout the composite; this is because the machine operates under a limited design and control. One of the things to be improved is the monitoring of the gradient of the temperature, and this can be done by making a few changes in the position of each thermocouple. Another thing to consider is to make a complete change in the control of the machine, that is, changing the hardware and software.
The changes in the machine will require different experiments in order to study the performance of the system, thus, observation will be a key parameter during the development of the project, considering that controlling the temperature takes a lot of time in order to establish a pattern.
Finally, the main idea will be to compare the performance of the current system with the new one, taking into account the final product, the time of the process, the money investment, among other things.