Campus del Baix Llobregat
 
Projectes oferts

Projectes matriculats

Tribunals i dates de lectura

Projectes llegits
(2019-2)

DG ENG AERO/SIS TEL

DG ENG AERO/TELEMÀT

DG ENG SISTE/TELEMÀT

ENG TELEC 2NCICLE 01

ET AERO/ETT SIST 05

ET AERONÀUTICA 03

ETT SIST/ ET AERO 05

ETT SIST TELEC 00

ETT SIST TELEC 91

ETT TELEMÀTICA 00

GR ENG AERONAVEGACIÓ

GR ENG AEROPORTS

GR ENG SIS TELECOMUN

GR ENG SIST AEROESP

GR ENG TELEMÀTICA

MU AEROSPACE S&T 09

MU DRONS

MU MASTEAM 2009

MU MASTEAM 2015

Cerca projectes

Calendari TFG de dipòsit i lectura

Documentació

Web UPC


 

Projecte llegit

Títol: Implementación del sistema EFB en una aeronave: Aplicación

Director: CASTAN PONZ, José Antonio

Departament: DEGD

Títol: Implementación del sistema EFB en una aeronave: Aplicación

Data inici oferta: 06-02-2020     Data finalització oferta: 06-10-2020


Estudis d'assignació del projecte:
    GR ENG AERONAVEGACIÓ
    GR ENG AEROPORTS
    GR ENG SIST AEROESP
Tipus: Individual
 
Lloc de realització: EETAC
 
Paraules clau:
Implementación, Aeronave, Aplicación, Cartera de Vuelo, EFB
 
Descripció del contingut i pla d'activitats:
Elección del Software del sistema EFB
Elección final del Hardware
Checklist en fase de prueba, para evaluar las competencias del
sistema y su efectividad.
Experiencias de los pilotos con la implementación del sistema
Curso de formación para las tripulaciones.
Aceptación de EASA
 
Overview (resum en anglès):
The aim of this project is the implementation of the EFB (Electronic Flight Bag) in the cabin of the fleet of the Company called Flightline. Model Fairchild Swearingen Metroliner. The main objectives of this change are: reduce the flight crew and ground personal workload, reduce the weight on the aircraft and clear space and minimize the human error when updating the charts and working with the documentation. Everything with a common objective, increase the safety in the air operation of the company. The EFB consists in an iPad containing the navigation charts, flight documentation, company manuals, and other documentation needed.

This project is divided in two main parts, due to its extension. The first one refers to the regulations, it contains the budgets, regulatory analysis, risk analysis, among others.

The second part, this one, include the operational testing, all the documentation needed to implement the change, an exhaustive analysis of the software and hardware, the training courses for the pilots and ground crew, the change management (from an administrative point of view) and the realization of a DOA (Design organisation approval), to make a modification to the aircraft.

Finally, is being demonstrate, with the performed tests and the satisfaction of the flight crew, that all the objectives of the are being fulfilled. It is verified that the errors have been minimized and therefore the risks. At the same time, it provides them more facilities to perform habitual tasks and more free space in the cabin, that it is translate as more comfort to the cabin crew.

As part of the annex, there is the MPPE (manual of procedures and EFB policy) and also the documentation used by the maintenance department in order to perform the DOA, to install two new USB port charges in the cockpit.


Data de generació 26/01/2021