Projecte llegit
Títol: Development of the Concept of Operations for the future Heraklion airport
Estudiants que han llegit aquest projecte:
- GOICOECHEA CASANUEVA, ÁLVARO (data lectura: 30-08-2024)
- Cerca aquest projecte a Bibliotècnica
Director/a: TORRES I PLA, MARC ALBERT
Departament: FIS
Títol: Development of the Concept of Operations for the future Heraklion airport
Data inici oferta: 24-04-2024 Data finalització oferta: 24-12-2024
Estudis d'assignació del projecte:
- GR ENG SIST AEROESP
Tipus: Individual | |
Lloc de realització: Fora UPC | |
Supervisor/a extern: Pere Camps | |
Institució/Empresa: ALG Indra | |
Titulació del Director/a: Enginyer Aeronàutic | |
Paraules clau: | |
Air Navigation, PBN, STAR, SID, Air Traffic Management, Instrument Flight Procedures, IFP | |
Descripció del contingut i pla d'activitats: | |
The current Heraklion International Airport (LGIR) is the second largest airport, in terms of traffic and destinations, in Greece following Athens Intl. and it faces congestion constraints during peak months, with a significant growth in the last years, together with under the standard modern passenger facilities aimed for popular destinations as Crete.
A new airport is under construction at Kasteli, approximately thirty (30) kilometers southeast of the existing Heraklion Airport. The objective of the Airspace and ATM Concept of Operations (ConOps) is to define the general design guidelines, considerations, constraints and assumptions that need to be taken on-board for the upcoming design of the flight procedures and airspace of the future Kasteli airport. The ConOps needs to identify all the essential components of a solid planning foundation on which the next phase of the conceptual design can be built. The elements of the planning will answer the questions of "why" is needed to pursue these changes through defined objectives, as well as the basis of "what" we will do and "how" we will do it, from the agreement of operational requirements and the scope and timeline within which they will be accomplished. |
|
Overview (resum en anglès): | |
The New International Airport Heraklion, Crete will substitute the Iraklion Nikos Kazantzakis airport in the island of Crete in Greece, airport for which Advanced Logistics Group (ALG) was the selected contractor to perform the Flight Procedures Design.
This Airspace and ATM Concept of Operations (ConOps) of the Project "Development of PBN procedures for New International Airport Heraklion, Crete" defines the general design guidelines, considerations, constraints and assumptions that need to be taken on-board for the upcoming design phase of the project,starting in September 2024. |