CBL - Campus del Baix Llobregat

Projecte matriculat

Títol: Holistic DCB with entry counts


Director/a: MELGOSA FARRÉS, MARC

Departament: FIS

Títol: Holistic DCB with entry counts

Data inici oferta: 12-03-2024     Data finalització oferta: 13-03-2024



Estudis d'assignació del projecte:
    GR ENG SIST AEROESP
Tipus: Individual
 
Lloc de realització: EETAC
 
Paraules clau:
Demand; Capacity; Heuristic; optimisation; ATFCM
 
Descripció del contingut i pla d'activitats:
Nowadays air traffic demand and capacity is deployed sequentially and separately. First, the sector opening scheme is defined considering the forecast traffic demand. Then, if needed the demand management initiatives are deployed. Hence, the proposed opening scheme might be not optimal when the demand initiatives have finished. For this reason, considering demand and capacity management together in the same optimisation problem might improve the performance of the Air Traffic Flow and Capacity Management initiatives.
The TFG must study the holistic DCB model and must provide solution methods.
 
Orientació a l'estudiant:
Air Traffic Management, Air Traffic Flow and Capacity Management, Programming skills.
 
Requereix activitats hardware: No
 
Requereix activitats software: No
 
Horari d'atenció a estudiants per a l'assignació de projecte:

© CBLTIC Campus del Baix Llobregat - UPC