Títol: Cost-Benefit Analysis of implementing operational efficiency initiatives at King Khalid International Airport


Estudiants que han llegit aquest projecte:


Director/a: TRAPOTE BARREIRA, CÉSAR

Departament: FIS

Títol: Cost-Benefit Analysis of implementing operational efficiency initiatives at King Khalid International Airport

Data inici oferta: 23-02-2023     Data finalització oferta: 23-10-2023



Estudis d'assignació del projecte:
    GR ENG SIST AEROESP
Tipus: Individual
 
Lloc de realització: Fora UPC    
 
        Supervisor/a extern: Vladimir Coca Casanueva
        Institució/Empresa: ALG
        Titulació del Director/a: Enginyer Aeroespacial
 
Paraules clau:
Airport, optimization, performance, Riyadh, CBA
 
Descripció del contingut i pla d'activitats:
As part of the Vision 2030 and the current operational challenges faced by Riyadh and
Jeddah International Airports, it is imperative to transform the way the airport community
operates. The project focuses on the definition and implementation of initiatives that
target the operational improvement of the inefficiencies detected at both airports to
reach the Future Operational State based on target values for the main Key Performance
Indicators (i. e Taxi times and On-Time Performance)
 
Overview (resum en anglès):
In light of the operational inefficiencies identified at King Khalid International Airport in Riyadh, Saudi Arabia, this project aims to conduct a Cost-Benefit Analysis resulting from the implementation of 58 initiatives related to airport operational improvements, with the objective of ensuring the continuous support from all stakeholders involved in the process.

Firstly, an assessment of the costs and benefits associated with the implementation of the set of initiatives is carried out, taking into consideration the start date and the duration of their execution. However, given the high number of initiatives to be implemented, the complexity of engaging multiple stakeholders, and the need to estimate various inputs during the analysis, the results for the Cost-Benefit Analysis are presented as a function of different scenarios influenced by two fundamental variables: the Traffic Forecast and the Discount Rate applied.

For each Traffic scenario, a global result is presented, representing the total costs and benefits incurred in the implementation of the 58 initiatives. Additionally, a sensitivity analysis is performed for 6 different scenarios based on the applied discount rate, providing the corresponding Net Present Value (NPV) and Internal Rate of Return (IRR) values for each stakeholder, and enabling a more precise and detailed performance assessment.

Finally, the results obtained for the different scenarios are compared, and the most significant findings are highlighted.